PP Raffia Machine

Home > Equitments

 

Part 1: Application

PP Raffia Machine can use 100% PP recycled plastic particles or broken material, or new material. 

Part 2: Construction and Specification

1.     Extruder : 

Dia. of screw:                                                   65mm

Ratio of L/D:                                                       30:1

 Material:                                                        38#CrMonALA

 Gear box:                                                       173# hard teeth gear box

 Driving power:                                                    18.5kw

 Heating power:                                                   20kw

 Extruding output:                                                40-60kgs/h

 

2.     The first stretching device:

Linear velocity of stretching cylinder:                      10-22m/min

Dia. of stretching cylinder:                                     140mm

Driving power:                                                       3kw

 

3.     Heat extension board:

Area of heat extension board:                                4*0.8m

Electric heater power                                              15kw

Heating temperature                                              80-130℃

 

4.     The second stretching device:

Linear velocity of stretching cylinder:                         6-18m/min

Dia. of stretching cylinder:                                       270

Driving power:                                                         5.5kw

 

5.     Coiling machine:

Coiling speed:                                                          50-180m/min

Specification of coiling torque motor:                      250kgf-cm

Spindle quantity:                                                       12pcs

Spindle speed change:                                               booster adjust whole tensile force

Lead:                                                                       300mm

 

Part 3: PP Raffia Rope Shown 


 

 

Part 4: Payment Term and Delivery Time:

1.Payment Term: 30% advance payment and 70% balanced before delivery.

2.Delivery Time:40 days after getting your 30% advance payment.

 

Part 5: Installation, Repair and Technical Service:

1、Seller takes in charge of installation and commissioning in china mainland, but buyer need to assist seller. If it needs to install abroad, the buyer should supply relevant engineer round-trip ticket, cost for visa, room and board, and pay salary for engineer should be paid by buyer.

2、The Guarantee period is one year on the premise of correct usage and maintenance, but excluded of quick-wear parts and non special parts, such as belts, chain, bearing, knives, mould and so on.

3、Seller will provide the whole process manual.

4、Seller will provide technical support and spares with net price long time.

return
| VIEW: 634
Copyright © 2024Fubang Company, All rights reserved. ICP 07001362